A Permit to Operate (PTO) is a regulatory requirement issued by the Department of Environment and Natural Resources – Environmental Management Bureau (DENR-EMB) for facilities that operate air pollution-emitting equipment or sources. It ensures compliance with the Clean Air Act of 1999 (RA 8749) and DENR regulations.
As an experienced environmental consultant in the Philippines, we help businesses secure PTOs quickly while complying with all DENR technical and legal requirements.
What Is a PTO?
A Permit to Operate certifies that:
- Your facility’s air pollution sources meet emission standards
- Pollution control devices are properly installed and functioning
- The facility complies with the Clean Air Act and DENR MCs
- Continuous monitoring and reporting obligations are understood and in place
PTO Application Process (Step-by-Step)
- 1
Prepare Facility Documents
List of all air pollution sources, equipment specifications, pollution control devices installed, and facility layout maps.
- 2
Submit Application to EMB
Include completed forms, supporting documents, and pay filing fees.
- 3
Initial EMB Inspection
EMB technical team inspects pollution sources and control devices to verify compliance.
- 4
Emission Testing
Conducted by EMB or accredited testing laboratory to ensure pollutant levels meet regulatory limits.
- 5
PTO Issuance
EMB issues PTO with a validity period (usually 1–5 years) and specific monitoring conditions.
Why Hire a PTO Consultant?
A professional environmental consultant:
DIY submissions often result in failed inspections and multiple re-submissions.
Our PTO Consulting Services
We provide:
- PTO application preparation and submission
- Equipment and facility emission evaluation
- Pollution control device assessment
- EMB coordination and inspection support
- Renewal and compliance management
Serving clients across Metro Manila, Bulacan, Region III, CALABARZON, Region 4B, Nationwide.
Ensure your facility meets Philippine Clean Air Act requirements and avoid operational interruptions.
Request a QuoteRA 8749 – Philippine Clean Air Act
DENR DAO 2000-81 – PTO Guidelines
DENR MC 2006-09 – Emission Testing
Facilities with air pollution sources.
Examples: Factories, power plants, facilities with boilers or generators, paint booths, etc.
PTO application form
Facility layout and process flows
List of air pollution sources
Pollution control device specs
ECC (if applicable)
Environmental Management Plan (EMP)
| Validity | 1–5 years |
| Renewal | Before expiry |
Renewal is mandatory to avoid penalties.
Incomplete documents
Non-functional control devices
Incorrect emission data
Missing ECC